NESO called a Turn Down event on 1 Apr 2025, running from 17:00 to 19:00 across 4 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 7 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 36
accepted / total
Participants
7
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (7)
OCTOPUS 218.1 MW @ £150/MWhGRIDBEYOND 31.2 MW @ £126/MWhOAKTREE 12.0 MW @ £657/MWhAXLE 11.3 MW @ £642/MWhGRIDIMP 4.0 MW @ £120/MWhEQUIWATT 3.8 MW @ £150/MWhSSE 2.6 MW @ £490/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 0.0 MW218.1 MW rejected | £0 | £150/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW31.2 MW rejected | £0 | £125/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW12.0 MW rejected | £0 | £539/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW11.3 MW rejected | £0 | £642/MWhrej |
| GRIDIMP LTD | 0.0 MW4.0 MW rejected | £0 | £120/MWhrej |
| EQUIWATT LIMITED | 0.0 MW3.8 MW rejected | £0 | £150/MWhrej |
| SSE DIGITAL SERVICES LIMITED | 0.0 MW2.6 MW rejected | £0 | £490/MWhrej |