NESO called a Turn Down event on 4 Apr 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 19.8 MW was procured against a 500.0 MW requirement (4% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
19.8 MW
4% of requirement
Bid Cost
£1.1k
Bids
4 / 66
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (4)
GRIDBEYOND 46.8 MW @ £140/MWhCUB 13.6 MW @ £127/MWhOAKTREE 12.0 MW @ £648/MWhAXLE 11.3 MW @ £642/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 19.8 MW159.6 MW rejected | £2.3k | £115/MWh |
| GRIDBEYOND LIMITED | 0.0 MW46.8 MW rejected | £0 | £140/MWhrej |
| CUB (UK) LTD | 0.0 MW13.6 MW rejected | £0 | £127/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW12.0 MW rejected | £0 | £526/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW11.3 MW rejected | £0 | £642/MWhrej |