NESO called a Turn Down event on 15 Apr 2025, running from 17:00 to 21:00 across 8 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 54
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (4)
GRIDBEYOND 82.4 MW @ £133/MWhOAKTREE 20.0 MW @ £258/MWhHILDEBRAND 8.0 MW @ £104/MWhEQUIWATT 4.0 MW @ £150/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| GRIDBEYOND LIMITED | 0.0 MW82.4 MW rejected | £0 | £133/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW20.0 MW rejected | £0 | £234/MWhrej |
| HILDEBRAND TECHNOLOGY LIMITED | 0.0 MW8.0 MW rejected | £0 | £104/MWhrej |
| EQUIWATT LIMITED | 0.0 MW4.0 MW rejected | £0 | £150/MWhrej |