NESO called a Turn Down event on 16 Apr 2025, running from 19:00 to 22:00 across 4 half-hour settlement periods. 9.0 MW was procured against a 500.0 MW requirement (2% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
9.0 MW
2% of requirement
Bid Cost
£426
Bids
7 / 30
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (2)
GRIDBEYOND 41.2 MW @ £140/MWhEQUIWATT 4.0 MW @ £150/MWh
Half-Hour Periods
19:00
19:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OAKTREE POWER LIMITED | 6.0 MW8.0 MW rejected | £606 | £101/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 3.0 MW1.0 MW rejected | £245 | £82/MWh |
| GRIDBEYOND LIMITED | 0.0 MW41.2 MW rejected | £0 | £140/MWhrej |
| EQUIWATT LIMITED | 0.0 MW4.0 MW rejected | £0 | £150/MWhrej |