DFS Monitorkilowatts.io
2025-06

5 Jun 2025

Turn Down

NESO called a Turn Down event on 5 Jun 2025, running from 18:00 to 20:00 across 4 half-hour settlement periods. 12.0 MW was procured against a 500.0 MW requirement (2% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
12.0 MW
2% of requirement
Bid Cost
£644
Bids
8 / 30
accepted / total
Participants
5

Accepted Volume by Participant

Aggregated across 4 half-hour periods, sorted by accepted volume

All bids rejected (3)
GRIDBEYOND 73.6 MW @ £150/MWhEQUIWATT 5.6 MW @ £125/MWhGRIDIMP 4.0 MW @ £150/MWh

Half-Hour Periods

18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
OAKTREE POWER LIMITED
8.0 MW
£848£106/MWh
HILDEBRAND TECHNOLOGY LIMITED
4.0 MW
£439£110/MWh
GRIDBEYOND LIMITED
0.0 MW73.6 MW rejected
£0£150/MWhrej
EQUIWATT LIMITED
0.0 MW5.6 MW rejected
£0£125/MWhrej
GRIDIMP LTD
0.0 MW4.0 MW rejected
£0£150/MWhrej