NESO called a Turn Down event on 7 Jun 2025, running from 19:00 to 21:00 across 4 half-hour settlement periods. 0.0 MW was procured against a 400.0 MW requirement (0% fill rate), with 1 participant submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
400.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 16
accepted / total
Participants
1
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (1)
GRIDBEYOND 73.6 MW @ £140/MWh
Half-Hour Periods
19:00
19:30
20:00
20:30
ProcuredSettledReq: 400.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| GRIDBEYOND LIMITED | 0.0 MW73.6 MW rejected | £0 | £140/MWhrej |