NESO called a Turn Down event on 23 Jun 2025, running from 19:00 to 21:00 across 4 half-hour settlement periods. 47.5 MW was procured against a 500.0 MW requirement (10% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
47.5 MW
10% of requirement
Bid Cost
£2.0k
Bids
18 / 44
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (4)
GRIDBEYOND 73.6 MW @ £135/MWhEQUIWATT 5.6 MW @ £120/MWhGRIDIMP 4.0 MW @ £160/MWhOAKTREE 4.0 MW @ £129/MWh
Half-Hour Periods
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 45.5 MW | £3.8k | £84/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 2.0 MW2.0 MW rejected | £171 | £86/MWh |
| GRIDBEYOND LIMITED | 0.0 MW73.6 MW rejected | £0 | £135/MWhrej |
| EQUIWATT LIMITED | 0.0 MW5.6 MW rejected | £0 | £120/MWhrej |
| GRIDIMP LTD | 0.0 MW4.0 MW rejected | £0 | £160/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW4.0 MW rejected | £0 | £129/MWhrej |