NESO called a Turn Down event on 24 Jun 2025, running from 19:00 to 22:00 across 6 half-hour settlement periods. 84.5 MW was procured against a 500.0 MW requirement (17% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
84.5 MW
17% of requirement
Bid Cost
£4.6k
Bids
32 / 70
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (4)
GRIDBEYOND 110.4 MW @ £135/MWhGRIDIMP 6.0 MW @ £160/MWhHILDEBRAND 6.0 MW @ £123/MWhEQUIWATT 5.6 MW @ £125/MWh
Half-Hour Periods
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 80.5 MW | £8.8k | £109/MWh |
| OAKTREE POWER LIMITED | 4.0 MW | £444 | £111/MWh |
| GRIDBEYOND LIMITED | 0.0 MW110.4 MW rejected | £0 | £135/MWhrej |
| GRIDIMP LTD | 0.0 MW6.0 MW rejected | £0 | £160/MWhrej |
| HILDEBRAND TECHNOLOGY LIMITED | 0.0 MW6.0 MW rejected | £0 | £123/MWhrej |
| EQUIWATT LIMITED | 0.0 MW5.6 MW rejected | £0 | £125/MWhrej |