DFS Monitorkilowatts.io
2025-06

27 Jun 2025

Turn Down

NESO called a Turn Down event on 27 Jun 2025, running from 20:00 to 22:00 across 4 half-hour settlement periods. 28.6 MW was procured against a 500.0 MW requirement (6% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
28.6 MW
6% of requirement
Bid Cost
£1.4k
Bids
16 / 40
accepted / total
Participants
5

Accepted Volume by Participant

Aggregated across 4 half-hour periods, sorted by accepted volume

All bids rejected (3)
GRIDBEYOND 73.6 MW @ £150/MWhEQUIWATT 6.0 MW @ £350/MWhGRIDIMP 4.0 MW @ £160/MWh

Half-Hour Periods

20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
26.6 MW
£2.6k£97/MWh
HILDEBRAND TECHNOLOGY LIMITED
2.0 MW2.0 MW rejected
£222£111/MWh
GRIDBEYOND LIMITED
0.0 MW73.6 MW rejected
£0£150/MWhrej
EQUIWATT LIMITED
0.0 MW6.0 MW rejected
£0£350/MWhrej
GRIDIMP LTD
0.0 MW4.0 MW rejected
£0£160/MWhrej