NESO called a Turn Down event on 22 Jul 2025, running from 18:00 to 21:00 across 6 half-hour settlement periods. 1.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
1.0 MW
0% of requirement
Bid Cost
£45
Bids
1 / 60
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (4)
INFINIS 90.7 MW @ £105/MWhGRIDBEYOND 50.4 MW @ £135/MWhOAKTREE 14.0 MW @ £106/MWhGRIDIMP 4.0 MW @ £160/MWh
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 1.0 MW5.0 MW rejected | £90 | £90/MWh |
| INFINIS LIMITED | 0.0 MW90.7 MW rejected | £0 | £106/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW50.4 MW rejected | £0 | £135/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW14.0 MW rejected | £0 | £106/MWhrej |
| GRIDIMP LTD | 0.0 MW4.0 MW rejected | £0 | £160/MWhrej |