NESO called a Turn Down event on 6 Nov 2025, running from 17:00 to 18:00 across 2 half-hour settlement periods. 80.8 MW was procured against a 200.0 MW requirement (40% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
200.0 MW
Procured
80.8 MW
40% of requirement
Bid Cost
£4.8k
Bids
4 / 16
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 2 half-hour periods, sorted by accepted volume
All bids rejected (4)
OAKTREE 10.0 MW @ £148/MWhGRIDBEYOND 6.0 MW @ £200/MWhGRIDIMP 2.0 MW @ £160/MWhUTILITA 2.0 MW @ £340/MWh
Half-Hour Periods
17:00
17:30
ProcuredSettledReq: 200.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 72.2 MW | £8.7k | £120/MWh |
| EQUIWATT LIMITED | 8.6 MW | £946 | £110/MWh |
| OAKTREE POWER LIMITED | 0.0 MW10.0 MW rejected | £0 | £147/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW6.0 MW rejected | £0 | £200/MWhrej |
| GRIDIMP LTD | 0.0 MW2.0 MW rejected | £0 | £160/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW2.0 MW rejected | £0 | £340/MWhrej |