Nov 2025
DFS events called during Nov 2025, part of the winter Turn Down season. NESO called 7 events this month, of which 7 resulted in procured volume. Each event below shows the time window, volume procured versus requirement, cost, and number of participants. Click any event to see the full bid-level breakdown.
Event Days
7
7 with volume
Procured
1.28 GW
Settled Cost
£24.7k
Avg Price
£136/MWh
Events
26 Nov 202516:00–20:00Turn Down
225.3 MW procured of 500.0 MW · £16.2k · 3 participants · 28 accepted / 16 rejected · £144/MWh
45%
25 Nov 202516:00–20:00Turn Down
155.3 MW procured of 500.0 MW · £16.0k · 3 participants · 4 accepted / 32 rejected · £206/MWh
31%
21 Nov 202516:00–20:00Turn Down
171.7 MW procured of 1.00 GW · £13.5k · 3 participants · 30 accepted / 0 rejected · £157/MWh
17%
20 Nov 202516:00–23:00Turn Down
287.7 MW procured of 500.0 MW · £17.0k · 6 participants · 32 accepted / 25 rejected · £118/MWh
58%
19 Nov 202516:00–20:00Turn Down
182.1 MW procured of 500.0 MW · £9.6k · 7 participants · 24 accepted / 33 rejected · £105/MWh
36%
18 Nov 202516:00–20:00Turn Down
174.1 MW procured of 500.0 MW · £9.7k · 7 participants · 19 accepted / 29 rejected · £112/MWh
35%
6 Nov 202517:00–18:00Turn Down
80.8 MW procured of 200.0 MW · £4.8k · 6 participants · 4 accepted / 12 rejected · £119/MWh
40%
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 1.10 GW211.7 MW rejected | £148.1k | £128/MWh |
| OAKTREE POWER LIMITED | 138.5 MW81.5 MW rejected | £21.1k | £152/MWh |
| EQUIWATT LIMITED | 20.8 MW31.8 MW rejected | £2.4k | £115/MWh |
| GRIDBEYOND LIMITED | 6.0 MW138.0 MW rejected | £1.1k | £180/MWh |
| GALLAGHER AGGREGATES LIMITED | 4.0 MW20.0 MW rejected | £480 | £120/MWh |
| GRIDIMP LTD | 4.0 MW10.0 MW rejected | £640 | £160/MWh |
| UTILITA ENERGY LIMITED | 0.0 MW11.0 MW rejected | £0 | £340/MWhrej |