NESO called a Turn Down event on 8 Jan 2026, running from 16:00 to 20:00 across 8 half-hour settlement periods. 123.4 MW was procured against a 500.0 MW requirement (25% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
123.4 MW
25% of requirement
Bid Cost
£16.0k
Bids
14 / 63
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (3)
EQUIWATT 28.8 MW @ £425/MWhGRIDBEYOND 24.0 MW @ £319/MWhUTILITA 3.0 MW @ £340/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 107.4 MW56.7 MW rejected | £26.9k | £250/MWh |
| OAKTREE POWER LIMITED | 16.0 MW48.0 MW rejected | £5.2k | £324/MWh |
| EQUIWATT LIMITED | 0.0 MW28.8 MW rejected | £0 | £425/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW24.0 MW rejected | £0 | £319/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.0 MW rejected | £0 | £340/MWhrej |