NESO called a Turn Down event on 14 Jan 2026, running from 16:00 to 20:00 across 8 half-hour settlement periods. 95.2 MW was procured against a 500.0 MW requirement (19% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
95.2 MW
19% of requirement
Bid Cost
£6.1k
Bids
16 / 64
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (3)
OCTOPUS 324.9 MW @ £180/MWhGRIDBEYOND 24.0 MW @ £168/MWhUTILITA 3.0 MW @ £340/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 64.8 MW69.3 MW rejected | £8.1k | £124/MWh |
| OAKTREE POWER LIMITED | 16.0 MW48.0 MW rejected | £2.3k | £145/MWh |
| EQUIWATT LIMITED | 14.4 MW | £1.7k | £120/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW324.9 MW rejected | £0 | £180/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW24.0 MW rejected | £0 | £168/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.0 MW rejected | £0 | £340/MWhrej |