DFS Monitorkilowatts.io
2026-01

16 Jan 2026

Turn Down

NESO called a Turn Down event on 16 Jan 2026, running from 16:00 to 20:00 across 8 half-hour settlement periods. 172.0 MW was procured against a 500.0 MW requirement (34% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
172.0 MW
34% of requirement
Bid Cost
£10.8k
Bids
28 / 65
accepted / total
Participants
6

Accepted Volume by Participant

Aggregated across 8 half-hour periods, sorted by accepted volume

All bids rejected (4)
OCTOPUS 332.7 MW @ £180/MWhGRIDBEYOND 24.0 MW @ £178/MWhEQUIWATT 14.4 MW @ £335/MWhUTILITA 3.0 MW @ £340/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
140.0 MW
£17.4k£121/MWh
OAKTREE POWER LIMITED
32.0 MW32.0 MW rejected
£4.2k£133/MWh
OCTOPUS ENERGY LIMITED
0.0 MW332.7 MW rejected
£0£180/MWhrej
GRIDBEYOND LIMITED
0.0 MW24.0 MW rejected
£0£178/MWhrej
EQUIWATT LIMITED
0.0 MW14.4 MW rejected
£0£335/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.0 MW rejected
£0£340/MWhrej