NESO called a Turn Down event on 23 Jan 2026, running from 17:00 to 19:00 across 4 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 41
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (5)
OCTOPUS 331.0 MW @ £160/MWhINFINIS 124.8 MW @ £189/MWhOAKTREE 32.0 MW @ £130/MWhEQUIWATT 14.4 MW @ £110/MWhUTILITA 3.0 MW @ £340/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 0.0 MW331.0 MW rejected | £0 | £160/MWhrej |
| INFINIS LIMITED | 0.0 MW124.8 MW rejected | £0 | £165/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW32.0 MW rejected | £0 | £130/MWhrej |
| EQUIWATT LIMITED | 0.0 MW14.4 MW rejected | £0 | £110/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.0 MW rejected | £0 | £340/MWhrej |