DFS Monitorkilowatts.io
2026-01

26 Jan 2026

Turn Down

NESO called a Turn Down event on 26 Jan 2026, running from 17:00 to 19:00 across 4 half-hour settlement periods. 22.1 MW was procured against a 500.0 MW requirement (4% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
22.1 MW
4% of requirement
Bid Cost
£1.3k
Bids
2 / 45
accepted / total
Participants
6

Accepted Volume by Participant

Aggregated across 4 half-hour periods, sorted by accepted volume

All bids rejected (5)
OCTOPUS 325.9 MW @ £150/MWhOAKTREE 32.0 MW @ £140/MWhEQUIWATT 14.4 MW @ £150/MWhGRIDBEYOND 12.0 MW @ £175/MWhUTILITA 3.0 MW @ £340/MWh

Half-Hour Periods

17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
22.1 MW116.5 MW rejected
£2.6k£118/MWh
OCTOPUS ENERGY LIMITED
0.0 MW325.9 MW rejected
£0£150/MWhrej
OAKTREE POWER LIMITED
0.0 MW32.0 MW rejected
£0£140/MWhrej
EQUIWATT LIMITED
0.0 MW14.4 MW rejected
£0£150/MWhrej
GRIDBEYOND LIMITED
0.0 MW12.0 MW rejected
£0£175/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.0 MW rejected
£0£340/MWhrej