DFS Monitorkilowatts.io
2026-03

16 Mar 2026

Turn Down

NESO called a Turn Down event on 16 Mar 2026, running from 17:00 to 20:00 across 6 half-hour settlement periods. 98.0 MW was procured against a 500.0 MW requirement (20% fill rate), with 8 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
98.0 MW
20% of requirement
Bid Cost
£6.3k
Bids
29 / 73
accepted / total
Participants
8

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (5)
OCTOPUS 280.2 MW @ £4738/MWhEQUIWATT 28.8 MW @ £225/MWhHILDEBRAND 6.0 MW @ £147/MWhGRIDIMP 4.0 MW @ £180/MWhUTILITA 3.0 MW @ £340/MWh

Half-Hour Periods

17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
52.0 MW233.1 MW rejected
£7.0k£135/MWh
OAKTREE POWER LIMITED
40.0 MW8.0 MW rejected
£4.6k£115/MWh
GRIDBEYOND LIMITED
6.0 MW12.0 MW rejected
£900£150/MWh
OCTOPUS ENERGY LIMITED
0.0 MW280.2 MW rejected
£0£5073/MWhrej
EQUIWATT LIMITED
0.0 MW28.8 MW rejected
£0£225/MWhrej
HILDEBRAND TECHNOLOGY LIMITED
0.0 MW6.0 MW rejected
£0£147/MWhrej
GRIDIMP LTD
0.0 MW4.0 MW rejected
£0£180/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.0 MW rejected
£0£340/MWhrej