← Overview
Mar 2026
DFS events called during Mar 2026, part of the winter Turn Down season. NESO called 8 events this month, of which 7 resulted in procured volume. Each event below shows the time window, volume procured versus requirement, cost, and number of participants. Click any event to see the full bid-level breakdown.
Event Days
8
7 with volume
Procured
1.65 GW
Settled Cost
£78.1k
Avg Price
£151/MWh
Events
27 Mar 202616:00–19:00Turn Down
366.2 MW procured of 500.0 MW · £26.0k · 8 participants · 30 accepted / 41 rejected · £142/MWh
73%
23 Mar 202617:00–19:00Turn Down
540.6 MW procured of 500.0 MW · £42.1k · 7 participants · 45 accepted / 4 rejected · £156/MWh
108%
22 Mar 202617:00–18:00Turn Down
6.0 MW procured of 500.0 MW · £450 · 3 participants · 2 accepted / 4 rejected · £150/MWh
1%
20 Mar 202619:00–20:00Turn Down
238.9 MW procured of 300.0 MW · £17.7k · 8 participants · 24 accepted / 8 rejected · £148/MWh
80%
16 Mar 202617:00–20:00Turn Down
98.0 MW procured of 500.0 MW · £6.3k · 8 participants · 29 accepted / 44 rejected · £128/MWh
20%
11 Mar 202618:00–20:00Turn Down
0.0 MW procured of 500.0 MW · £0 · 5 participants · 0 accepted / 27 rejected
10 Mar 202616:00–20:00Turn Down
9.0 MW procured of 500.0 MW · £585 · 8 participants · 6 accepted / 84 rejected · £130/MWh
2%
9 Mar 202616:00–20:00Turn Down
395.9 MW procured of 500.0 MW · £32.0k · 7 participants · 38 accepted / 45 rejected · £162/MWh
79%
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 733.1 MW1.19 GW rejected | £110.1k | £150/MWh |
| INFINIS LIMITED | 696.3 MW948.7 MW rejected | £108.8k | £158/MWh |
| OAKTREE POWER LIMITED | 144.0 MW128.0 MW rejected | £19.0k | £132/MWh |
| EQUIWATT LIMITED | 43.2 MW115.2 MW rejected | £6.6k | £153/MWh |
| GRIDBEYOND LIMITED | 18.0 MW54.0 MW rejected | £2.7k | £150/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 10.0 MW24.0 MW rejected | £1.5k | £152/MWh |
| GRIDIMP LTD | 10.0 MW18.0 MW rejected | £1.6k | £160/MWh |
| UTILITA ENERGY LIMITED | 0.0 MW22.0 MW rejected | £0 | £340/MWhrej |