NESO called a Turn Down event on 14 Apr 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 268.0 MW was procured against a 500.0 MW requirement (54% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
268.0 MW
54% of requirement
Bid Cost
£16.4k
Bids
80 / 88
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 250.2 MW27.8 MW rejected | £30.9k | £123/MWh |
| EQUIWATT LIMITED | 17.8 MW | £1.9k | £105/MWh |