← Overview
Apr 2026
DFS events called during Apr 2026, part of the summer Turn Up season. NESO called 1 event this month, of which 1 resulted in procured volume. Each event below shows the time window, volume procured versus requirement, cost, and number of participants. Click any event to see the full bid-level breakdown.
Event Days
1
1 with volume
Procured
268.0 MW
Settled Cost
£0
Avg Price
£122/MWh
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 250.2 MW27.8 MW rejected | £30.9k | £123/MWh |
| EQUIWATT LIMITED | 17.8 MW | £1.9k | £105/MWh |