NESO called a Turn Up event on 30 Apr 2026, running from 12:00 to 16:00 across 8 half-hour settlement periods. 0.1 MW was procured against a 500.0 MW requirement (0% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.1 MW
0% of requirement
Bid Cost
£1
Bids
1 / 19
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (1)
INFINIS 17.5 MW @ £100/MWh
Half-Hour Periods
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OAKTREE POWER LIMITED | 0.1 MW0.1 MW rejected | £3 | £25/MWh |
| INFINIS LIMITED | 0.0 MW17.5 MW rejected | £0 | £100/MWhrej |