NESO called a Turn Down event on 6 May 2026, running from 18:00 to 22:00 across 8 half-hour settlement periods. 313.7 MW was procured against a 500.0 MW requirement (63% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
313.7 MW
63% of requirement
Bid Cost
£20.7k
Bids
47 / 47
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 311.3 MW | £41.0k | £132/MWh |
| OAKTREE POWER LIMITED | 2.4 MW | £264 | £110/MWh |