NESO called a Turn Down event on 7 May 2026, running from 15:00 to 22:00 across 14 half-hour settlement periods. 477.1 MW was procured against a 500.0 MW requirement (95% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
477.1 MW
95% of requirement
Bid Cost
£30.1k
Bids
87 / 90
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 14 half-hour periods, sorted by accepted volume
Half-Hour Periods
15:00
15:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 462.5 MW | £58.3k | £122/MWh |
| OAKTREE POWER LIMITED | 13.6 MW | £1.7k | £125/MWh |
| U ENERGY GROUP LIMITED | 1.0 MW0.3 MW rejected | £134 | £134/MWh |