DFS Monitorkilowatts.io
2026-05

26 May 2026

Turn Up

NESO called a Turn Up event on 26 May 2026, running from 13:00 to 15:00 across 4 half-hour settlement periods. 0.0 MW was procured against a 300.0 MW requirement (0% fill rate), with 1 participant submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
300.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 2
accepted / total
Participants
1

Accepted Volume by Participant

Aggregated across 4 half-hour periods, sorted by accepted volume

All bids rejected (1)
OAKTREE 0.2 MW @ £160/MWh

Half-Hour Periods

13:00
13:30
14:00
14:30
ProcuredSettledReq: 300.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
OAKTREE POWER LIMITED
0.0 MW0.2 MW rejected
£0£160/MWhrej
DFS Turn Up — 26 May 2026 | DFS Monitor