NESO called a Turn Up event on 26 May 2026, running from 13:00 to 15:00 across 4 half-hour settlement periods. 0.0 MW was procured against a 300.0 MW requirement (0% fill rate), with 1 participant submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 2
accepted / total
Participants
1
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (1)
OAKTREE 0.2 MW @ £160/MWh
Half-Hour Periods
13:00
13:30
14:00
14:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OAKTREE POWER LIMITED | 0.0 MW0.2 MW rejected | £0 | £160/MWhrej |