NESO called a Turn Down event on 10 Jun 2026, running from 18:00 to 21:00 across 6 half-hour settlement periods. 302.1 MW was procured against a 300.0 MW requirement (101% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
302.1 MW
101% of requirement
Bid Cost
£21.3k
Bids
91 / 91
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 264.3 MW | £37.1k | £140/MWh |
| OAKTREE POWER LIMITED | 20.4 MW | £2.7k | £133/MWh |
| EQUIWATT LIMITED | 16.8 MW | £2.7k | £160/MWh |
| U ENERGY GROUP LIMITED | 0.6 MW | £76 | £127/MWh |