NESO called a Turn Down event on 11 Jun 2026, running from 17:00 to 20:00 across 6 half-hour settlement periods. 221.3 MW was procured against a 500.0 MW requirement (44% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
221.3 MW
44% of requirement
Bid Cost
£12.9k
Bids
52 / 86
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (1)
EQUIWATT 13.2 MW @ £155/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 210.1 MW | £24.5k | £117/MWh |
| OAKTREE POWER LIMITED | 10.8 MW | £1.3k | £117/MWh |
| U ENERGY GROUP LIMITED | 0.4 MW0.2 MW rejected | £54 | £135/MWh |
| EQUIWATT LIMITED | 0.0 MW13.2 MW rejected | £0 | £155/MWhrej |