NESO called a Turn Down event on 22 Jun 2026, running from 18:00 to 22:00 across 8 half-hour settlement periods. 289.9 MW was procured against a 500.0 MW requirement (58% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
289.9 MW
58% of requirement
Bid Cost
£23.8k
Bids
156 / 156
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 258.7 MW | £42.2k | £164/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 29.6 MW | £5.1k | £171/MWh |
| Electric Miles Limited | 0.8 MW | £108 | £135/MWh |
| U ENERGY GROUP LIMITED | 0.8 MW | £108 | £135/MWh |