NESO called a Turn Down event on 23 Jun 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 558.8 MW was procured against a 500.0 MW requirement (112% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
558.8 MW
112% of requirement
Bid Cost
£68.7k
Bids
214 / 214
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 367.7 MW | £75.7k | £205/MWh |
| OCTOPUS ENERGY LIMITED | 152.9 MW | £53.4k | £349/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 36.8 MW | £8.1k | £219/MWh |
| U ENERGY GROUP LIMITED | 1.0 MW | £149 | £149/MWh |
| Electric Miles Limited | 0.4 MW | £54 | £135/MWh |