NESO called a Turn Down event on 24 Jun 2026, running from 16:00 to 23:00 across 14 half-hour settlement periods. 749.9 MW was procured against a 500.0 MW requirement (150% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
749.9 MW
150% of requirement
Bid Cost
£139.3k
Bids
274 / 279
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 14 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 514.8 MW49.4 MW rejected | £145.3k | £281/MWh |
| OCTOPUS ENERGY LIMITED | 184.6 MW | £119.8k | £649/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 49.3 MW | £13.3k | £265/MWh |
| U ENERGY GROUP LIMITED | 1.2 MW | £190 | £158/MWh |