NESO called a Turn Down event on 29 Jun 2026, running from 17:00 to 21:00 across 8 half-hour settlement periods. 322.1 MW was procured against a 500.0 MW requirement (64% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
322.1 MW
64% of requirement
Bid Cost
£25.6k
Bids
84 / 84
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 305.7 MW | £48.5k | £160/MWh |
| EQUIWATT LIMITED | 15.6 MW | £2.6k | £165/MWh |
| U ENERGY GROUP LIMITED | 0.8 MW | £112 | £140/MWh |