NESO called a Turn Down event on 3 Jul 2026, running from 17:00 to 19:00 across 4 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 14
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (2)
INFINIS 118.0 MW @ £109/MWhU 0.4 MW @ £110/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 0.0 MW118.0 MW rejected | £0 | £109/MWhrej |
| U ENERGY GROUP LIMITED | 0.0 MW0.4 MW rejected | £0 | £110/MWhrej |