NESO called a Turn Down event on 8 Jul 2026, running from 19:00 to 22:00 across 6 half-hour settlement periods. 198.9 MW was procured against a 500.0 MW requirement (40% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
198.9 MW
40% of requirement
Bid Cost
£14.2k
Bids
38 / 106
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (2)
OCTOPUS 177.4 MW @ £165/MWhEQUIWATT 18.8 MW @ £180/MWh
Half-Hour Periods
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 198.0 MW | £28.3k | £143/MWh |
| U ENERGY GROUP LIMITED | 0.6 MW | £84 | £140/MWh |
| Electric Miles Limited | 0.3 MW | £40 | £133/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW177.4 MW rejected | £0 | £165/MWhrej |
| EQUIWATT LIMITED | 0.0 MW18.8 MW rejected | £0 | £180/MWhrej |