NESO called a Turn Down event on 9 Jul 2026, running from 17:00 to 23:00 across 12 half-hour settlement periods. 466.4 MW was procured against a 500.0 MW requirement (93% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
466.4 MW
93% of requirement
Bid Cost
£47.3k
Bids
238 / 238
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 12 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 224.8 MW | £41.5k | £186/MWh |
| OCTOPUS ENERGY LIMITED | 178.1 MW | £38.3k | £215/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 42.7 MW | £7.2k | £168/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 12.0 MW | £6.0k | £500/MWh |
| EQUIWATT LIMITED | 7.8 MW | £1.4k | £180/MWh |
| U ENERGY GROUP LIMITED | 1.0 MW | £170 | £170/MWh |