NESO called a Turn Down event on 13 Jul 2026, running from 16:00 to 23:00 across 14 half-hour settlement periods. 658.1 MW was procured against a 500.0 MW requirement (132% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
658.1 MW
132% of requirement
Bid Cost
£43.3k
Bids
201 / 297
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 14 half-hour periods, sorted by accepted volume
All bids rejected (1)
EQUIWATT 9.4 MW @ £350/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 464.9 MW | £58.6k | £124/MWh |
| OCTOPUS ENERGY LIMITED | 181.2 MW | £26.3k | £145/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 9.6 MW7.2 MW rejected | £1.4k | £148/MWh |
| U ENERGY GROUP LIMITED | 2.4 MW0.4 MW rejected | £278 | £116/MWh |
| EQUIWATT LIMITED | 0.0 MW9.4 MW rejected | £0 | £350/MWhrej |