NESO called a Turn Down event on 14 Jul 2026, running from 18:00 to 22:00 across 8 half-hour settlement periods. 193.6 MW was procured against a 300.0 MW requirement (65% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
193.6 MW
65% of requirement
Bid Cost
£14.4k
Bids
28 / 54
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (1)
OCTOPUS 121.8 MW @ £200/MWh
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 191.8 MW55.2 MW rejected | £28.5k | £149/MWh |
| U ENERGY GROUP LIMITED | 1.6 MW | £208 | £130/MWh |
| Electric Miles Limited | 0.2 MW | £27 | £135/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW121.8 MW rejected | £0 | £200/MWhrej |