NESO called a Turn Down event on 28 Jul 2026, running from 18:00 to 21:00 across 6 half-hour settlement periods. 289.7 MW was procured against a 500.0 MW requirement (58% fill rate), with 7 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
289.7 MW
58% of requirement
Bid Cost
£23.5k
Bids
121 / 147
accepted / total
Participants
7
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (1)
AXLE 19.0 MW @ £190/MWh
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 135.4 MW | £21.3k | £157/MWh |
| OCTOPUS ENERGY LIMITED | 79.3 MW70.7 MW rejected | £13.5k | £170/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 59.7 MW | £9.9k | £165/MWh |
| EQUIWATT LIMITED | 13.6 MW | £2.1k | £155/MWh |
| U ENERGY GROUP LIMITED | 1.1 MW | £167 | £152/MWh |
| OAKTREE POWER LIMITED | 0.6 MW0.4 MW rejected | £98 | £163/MWh |
| AXLE ENERGY LIMITED | 0.0 MW19.0 MW rejected | £0 | £190/MWhrej |