NESO called a Turn Down event on 29 Jul 2026, running from 18:00 to 22:00 across 8 half-hour settlement periods. 123.5 MW was procured against a 500.0 MW requirement (25% fill rate), with 7 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
123.5 MW
25% of requirement
Bid Cost
£9.9k
Bids
39 / 178
accepted / total
Participants
7
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (4)
OCTOPUS 173.9 MW @ £180/MWhEQUIWATT 15.6 MW @ £185/MWhOAKTREE 1.0 MW @ £212/MWhAXLE 0.9 MW @ £180/MWh
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 100.8 MW126.0 MW rejected | £16.0k | £160/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 22.2 MW64.6 MW rejected | £3.8k | £169/MWh |
| U ENERGY GROUP LIMITED | 0.5 MW0.8 MW rejected | £83 | £165/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW173.9 MW rejected | £0 | £180/MWhrej |
| EQUIWATT LIMITED | 0.0 MW15.6 MW rejected | £0 | £185/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW1.0 MW rejected | £0 | £212/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW0.9 MW rejected | £0 | £180/MWhrej |