NESO called a Turn Down event on 3 Aug 2026, running from 18:00 to 22:00 across 8 half-hour settlement periods. 544.7 MW was procured against a 500.0 MW requirement (109% fill rate), with 8 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
544.7 MW
109% of requirement
Bid Cost
£45.2k
Bids
189 / 189
accepted / total
Participants
8
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 270.0 MW | £43.8k | £161/MWh |
| OCTOPUS ENERGY LIMITED | 167.5 MW | £28.6k | £171/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 86.3 MW | £14.5k | £168/MWh |
| EQUIWATT LIMITED | 15.6 MW | £2.6k | £165/MWh |
| AXLE ENERGY LIMITED | 2.7 MW | £458 | £170/MWh |
| U ENERGY GROUP LIMITED | 1.2 MW | £189 | £155/MWh |
| Shuffle Energy Limited | 0.8 MW | £131 | £164/MWh |
| OAKTREE POWER LIMITED | 0.6 MW | £104 | £174/MWh |