NESO called a Turn Down event on 30 Jul 2026, running from 19:00 to 22:00 across 6 half-hour settlement periods. 79.6 MW was procured against a 500.0 MW requirement (16% fill rate), with 8 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
79.6 MW
16% of requirement
Bid Cost
£6.4k
Bids
50 / 153
accepted / total
Participants
8
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (3)
OCTOPUS 172.5 MW @ £188/MWhEQUIWATT 15.6 MW @ £182/MWhShuffle 0.6 MW @ £182/MWh
Half-Hour Periods
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 44.2 MW20.4 MW rejected | £7.6k | £171/MWh |
| INFINIS LIMITED | 34.0 MW128.0 MW rejected | £4.9k | £145/MWh |
| AXLE ENERGY LIMITED | 0.8 MW | £136 | £169/MWh |
| OAKTREE POWER LIMITED | 0.4 MW0.2 MW rejected | £69 | £172/MWh |
| U ENERGY GROUP LIMITED | 0.2 MW0.7 MW rejected | £29 | £145/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW172.5 MW rejected | £0 | £188/MWhrej |
| EQUIWATT LIMITED | 0.0 MW15.6 MW rejected | £0 | £182/MWhrej |
| Shuffle Energy Limited | 0.0 MW0.6 MW rejected | £0 | £182/MWhrej |