NESO called a Turn Down event on 10 Aug 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 88.6 MW was procured against a 500.0 MW requirement (18% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
88.6 MW
18% of requirement
Bid Cost
£6.0k
Bids
13 / 165
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
All bids rejected (3)
HILDEBRAND 91.0 MW @ £163/MWhAXLE 6.1 MW @ £167/MWhU 1.5 MW @ £164/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 88.4 MW123.7 MW rejected | £12.0k | £134/MWh |
| OAKTREE POWER LIMITED | 0.2 MW0.4 MW rejected | £26 | £130/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 0.0 MW91.0 MW rejected | £0 | £163/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW6.1 MW rejected | £0 | £167/MWhrej |
| U ENERGY GROUP LIMITED | 0.0 MW1.5 MW rejected | £0 | £168/MWhrej |