NESO called a Turn Down event on 11 Aug 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 555.3 MW was procured against a 500.0 MW requirement (111% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
555.3 MW
111% of requirement
Bid Cost
£41.5k
Bids
223 / 223
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 400.4 MW | £57.7k | £143/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 110.6 MW | £17.5k | £158/MWh |
| AXLE ENERGY LIMITED | 23.7 MW | £4.5k | £189/MWh |
| EQUIWATT LIMITED | 18.4 MW | £3.0k | £162/MWh |
| U ENERGY GROUP LIMITED | 1.6 MW | £259 | £163/MWh |
| OAKTREE POWER LIMITED | 0.6 MW | £96 | £160/MWh |