NESO called a Turn Down event on 16 Aug 2026, running from 19:00 to 22:00 across 6 half-hour settlement periods. 2.7 MW was procured against a 500.0 MW requirement (1% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
2.7 MW
1% of requirement
Bid Cost
£228
Bids
24 / 60
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
Half-Hour Periods
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 1.8 MW3.6 MW rejected | £311 | £173/MWh |
| U ENERGY GROUP LIMITED | 0.9 MW | £145 | £160/MWh |