NESO called a Turn Down event on 15 Aug 2026, running from 19:00 to 21:00 across 4 half-hour settlement periods. 5.5 MW was procured against a 500.0 MW requirement (1% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
5.5 MW
1% of requirement
Bid Cost
£457
Bids
52 / 52
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
Half-Hour Periods
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 4.8 MW | £803 | £167/MWh |
| U ENERGY GROUP LIMITED | 0.7 MW | £111 | £159/MWh |