NESO called a Turn Down event on 30 Aug 2026, running from 18:00 to 14:00 across 10 half-hour settlement periods. 361.6 MW was procured against a 500.0 MW requirement (72% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
361.6 MW
72% of requirement
Bid Cost
£32.2k
Bids
117 / 117
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
13:00
13:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| Edgware Energy Limited | 258.9 MW | £46.6k | £180/MWh |
| St Breock Limited | 55.2 MW | £9.4k | £170/MWh |
| INFINIS LIMITED | 41.7 MW | £7.5k | £180/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 4.4 MW | £601 | £137/MWh |
| U ENERGY GROUP LIMITED | 1.2 MW | £213 | £178/MWh |
| Shuffle Energy Limited | 0.2 MW | £36 | £180/MWh |