NESO called a Turn Down event on 31 Aug 2026, running from 19:00 to 22:00 across 6 half-hour settlement periods. 152.0 MW was procured against a 500.0 MW requirement (30% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
152.0 MW
30% of requirement
Bid Cost
£12.6k
Bids
111 / 167
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
Half-Hour Periods
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 128.5 MW53.2 MW rejected | £21.3k | £163/MWh |
| EQUIWATT LIMITED | 19.2 MW | £3.2k | £165/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 3.6 MW3.6 MW rejected | £605 | £168/MWh |
| U ENERGY GROUP LIMITED | 0.5 MW0.3 MW rejected | £84 | £168/MWh |
| Shuffle Energy Limited | 0.2 MW0.4 MW rejected | £35 | £175/MWh |