Turn Down

NESO called a Turn Down event on 2 Sep 2026, running from 20:00 to 22:00 across 4 half-hour settlement periods. 306.2 MW was procured against a 300.0 MW requirement (102% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
300.0 MW
Procured
306.2 MW
102% of requirement
Bid Cost
£23.9k
Bids
97 / 151
accepted / total
Participants
11

Accepted Volume by Participant

Aggregated across 4 half-hour periods, sorted by accepted volume

All bids rejected (2)
AXLE 23.9 MW @ £298/MWhEQUIWATT 16.0 MW @ £260/MWh

Half-Hour Periods

20:00
20:30
21:00
21:30
ProcuredSettledReq: 300.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
OCTOPUS ENERGY LIMITED
198.4 MW
£28.8k£145/MWh
INFINIS LIMITED
49.6 MW
£8.9k£174/MWh
Goonhilly Limited
17.8 MW
£3.0k£170/MWh
St Breock Limited
16.9 MW
£2.9k£170/MWh
Sancton Hill Limited
11.1 MW
£1.9k£170/MWh
ENGIE POWER LIMITED
8.0 MW
£1.6k£196/MWh
HILDEBRAND TECHNOLOGY LIMITED
3.6 MW
£603£168/MWh
Shuffle Energy Limited
0.4 MW
£68£170/MWh
U ENERGY GROUP LIMITED
0.4 MW
£69£172/MWh
AXLE ENERGY LIMITED
0.0 MW23.9 MW rejected
£0£306/MWhrej
EQUIWATT LIMITED
0.0 MW16.0 MW rejected
£0£260/MWhrej