DFS Monitorkilowatts.io
← 2026-09

1 Sep 2026

Turn Down

NESO called a Turn Down event on 1 Sep 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 525.8 MW was procured against a 300.0 MW requirement (175% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
300.0 MW
Procured
525.8 MW
175% of requirement
Bid Cost
£45.7k
Bids
223 / 263
accepted / total
Participants
11

Accepted Volume by Participant

Aggregated across 10 half-hour periods, sorted by accepted volume

All bids rejected (1)
AXLE 24.4 MW @ £306/MWh

Half-Hour Periods

17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 300.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
284.1 MW
£50.3k£176/MWh
OCTOPUS ENERGY LIMITED
175.8 MW
£29.5k£168/MWh
Sancton Hill Limited
23.4 MW
£4.0k£170/MWh
Goonhilly Limited
11.6 MW
£2.0k£170/MWh
St Breock Limited
10.8 MW
£1.8k£170/MWh
HILDEBRAND TECHNOLOGY LIMITED
9.5 MW
£1.7k£175/MWh
EQUIWATT LIMITED
8.0 MW8.0 MW rejected
£1.6k£196/MWh
U ENERGY GROUP LIMITED
1.2 MW0.4 MW rejected
£226£189/MWh
Shuffle Energy Limited
1.0 MW
£170£170/MWh
OAKTREE POWER LIMITED
0.4 MW0.4 MW rejected
£76£190/MWh
AXLE ENERGY LIMITED
0.0 MW24.4 MW rejected
£0£315/MWhrej