NESO called a Turn Down event on 5 Sep 2026, running from 19:00 to 16:00 across 8 half-hour settlement periods. 23.1 MW was procured against a 500.0 MW requirement (5% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
23.1 MW
5% of requirement
Bid Cost
£2.0k
Bids
65 / 113
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
Half-Hour Periods
19:00
19:30
20:00
20:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 18.4 MW | £3.2k | £174/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 3.6 MW4.8 MW rejected | £636 | £177/MWh |
| U ENERGY GROUP LIMITED | 0.7 MW | £118 | £168/MWh |
| Shuffle Energy Limited | 0.4 MW | £68 | £170/MWh |