Turn DownTurn Up

NESO called a Turn Down event on 5 Sep 2026, running from 19:00 to 16:00 across 8 half-hour settlement periods. 23.1 MW was procured against a 500.0 MW requirement (5% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
23.1 MW
5% of requirement
Bid Cost
£2.0k
Bids
65 / 113
accepted / total
Participants
4

Accepted Volume by Participant

Aggregated across 8 half-hour periods, sorted by accepted volume

Half-Hour Periods

19:00
19:30
20:00
20:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
18.4 MW
£3.2k£174/MWh
HILDEBRAND TECHNOLOGY LIMITED
3.6 MW4.8 MW rejected
£636£177/MWh
U ENERGY GROUP LIMITED
0.7 MW
£118£168/MWh
Shuffle Energy Limited
0.4 MW
£68£170/MWh