NESO called a Turn Down event on 6 Sep 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 73.6 MW was procured against a 500.0 MW requirement (15% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
73.6 MW
15% of requirement
Bid Cost
£6.2k
Bids
62 / 62
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 40.7 MW | £6.9k | £169/MWh |
| Sancton Hill Limited | 32.1 MW | £5.5k | £170/MWh |
| Shuffle Energy Limited | 0.8 MW | £140 | £175/MWh |